 鲜花( 30)  鸡蛋( 0)
|
本帖最后由 爱城一粒沙子 于 2015-7-29 16:33 编辑 & O. Z5 w, L9 i0 g6 B$ V9 s
. D: B& S q5 a6 j$ f$ c& H# M
Journeyman Electrician0 w$ X- i# K, m
Total Number of Positions: 20 Positions Filled: 16 High Number: 103939 TRAVELER-26 X7 x8 N, B1 t( h7 l) J. C
Contractor: Norcan Electric
4 ^ f6 g( g4 ~- r4 ~" lLocation: Syncrude Maintenace (Base Plant)7 n: A3 u: J5 }8 P/ f) C4 s- |
Description: R/ I# J: U* c2 g
Day shift, Start ASAP, 1 Week plus, 4/10's (May change to 10/4), Report after callout, Orientation to be confirmed, Working under the Maintenance Agreement, No beards, Own transportation, Camp provided if no residents, Industrial rate.
4 U0 ^" \" J4 j1 W A' cPre-Requisites / Conditions: Pre-Access D&A (Active RSAP Site), CSTS, Heavy Lifting, Bending, Pulling, Climbing, Working at Heights, Must Have 2 Way Radio Communication Experience, Confined Space/Fall Protection/Mask Fit/H2S Alive/ First Aid/AWP & EHT Experience Preferred.
) f* q) W2 }$ [3 jOpen Date: 07/22/2015( w& \4 e/ s4 d" c. Y2 P
Close Date: 08/31/20154 S* T+ e7 J9 ]& I p
Job #: 441 |
|