米乐 发表于 2014-6-24 22:12 
/ Q: Z% X2 L5 ^5 _6 K$ n1 [9 g一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ...
; D$ E+ l: J, p, V, h( L3 iDid you ever follow up with the builder?
) V& D7 m3 |3 ^. @# M0 Y7 d; D# X. vI would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.
/ M# A* q- ~! C( [/ VIt is too late to talk about this now. * R0 P1 q& V) a% [; p/ f! R8 I& P
If you have everything documented, show it to the lawyer and ask for hold back.1 P( ^/ i/ c1 q& ?
( ~7 c. S) J" Z2 \! y1 C7 m+ kIf you can live with the wall, ask the builder to compensate you instead of removing the wall.
2 M7 u! ^# Q2 N, V7 k1 @; d$ ]( MIt will be messy after you move in and they come back to take down the wall. |
|