 鲜花( 30)  鸡蛋( 0)
|
本帖最后由 爱城一粒沙子 于 2015-7-29 16:33 编辑
, @ @7 P2 c0 I3 `$ S
" }4 Y. |) O3 E5 [) EJourneyman Electrician3 v3 ]+ L) A/ h# H" Y. v+ q' r
Total Number of Positions: 20 Positions Filled: 16 High Number: 103939 TRAVELER-2' \3 |& C, x" k8 W
Contractor: Norcan Electric
# [6 W( H, e: o; w s: P4 ULocation: Syncrude Maintenace (Base Plant)
, N0 j0 u7 T$ m# c( VDescription:
( a. P. B3 @# F1 zDay shift, Start ASAP, 1 Week plus, 4/10's (May change to 10/4), Report after callout, Orientation to be confirmed, Working under the Maintenance Agreement, No beards, Own transportation, Camp provided if no residents, Industrial rate.. \4 A; L. K8 N7 y) H
Pre-Requisites / Conditions: Pre-Access D&A (Active RSAP Site), CSTS, Heavy Lifting, Bending, Pulling, Climbing, Working at Heights, Must Have 2 Way Radio Communication Experience, Confined Space/Fall Protection/Mask Fit/H2S Alive/ First Aid/AWP & EHT Experience Preferred.8 J7 C# g& @5 d
Open Date: 07/22/2015
( Q) A% z2 j1 S3 LClose Date: 08/31/2015+ {/ Y8 e( ?' ?& ~6 A! T8 t
Job #: 441 |
|